2H Offshore

Project Challenge

Subsea Energy Solutions were informed by 2 H Offshore that there was an immediate requirement for 2 off Diverless Passive J Tube Seals for the Petronas West Lutong and Tanjong Baram Projects.

The component requirements and associated challenges were as follows;

  1. Design 2 bespoke Diverless Passive J Tube Seals each of differing size.
  2. The design would be such to accommodate a low pull in force during the installation of the seals.
  3. The seals would be suitable to withstand and hold a differential pressure throughout their lifespan.
  4. The overall project was subject to extremely ambitious and tight timescales with an overall project lifecycle from design to delivery to be within four weeks. To add to the aggressive timescale, this project was to be undertaken within the festive period, significantly contributing to an already tight project delivery.
Project Solution

Subsea Energy Solutions set to work producing design drawings for approval by all parties concerned.

Upon receipt of approval manufacturing was undertaken with the remaining project time frame in mind. Initial build was completed with the products finalised ahead of time.

Product testing and final configuration was completed over the festive period to ensure the project was completed and delivered in line with the clients expectations.

Project Outcome

All equipment and accompanying documentation was finalised, tested and delivered to Enquest on the date required by the client.

The project was considered 100 % successful by all parties concerned.

 

 

 

Let us know your requirements

Subsea Energy Solutions are always available to discuss any requirement you may have.