SUB-BUNG-OWF-T™ Topside Grouting Bungs

Product Overview

SUB-BUNG-OWF-T™ Topside Grouting Bungs are utilsed during the transition piece (TP) to monopile (MP) grouting operations. The annular gap between the two structures is bottom filled injected with a grouting mixture. To ensure the grouting mixture level fills to the top of the annular gap, air must be vented to prevent a grouting airlock. SUB-BUNG-OWF-T™ Topside Grouting Bungs comprise a snorkel guided vertically into the hollow air-pocket. Once the bung is activated and sealing either 03-off or 04-off, 60 mm diameter holes, the grout mixture level shall fill to the top of the annular gap ensuring grouting joint integrity.

Product Images
  • PO-1712-SES-002-001 (details)
  • PO-1712-SES-003-008 (volume)
  • Sub Bung
  • Sub Bung
  • Sub Bung


  • Sub Bung
TECHNICAL SPECIFICATIONS
Description Specification
Design Rights Subsea Energy Solutions (UK) Ltd. / Company No. 7804453
Property Rights Subsea Energy Solutions (UK) Ltd. / Company No. 7804453
Intellectual Rights Subsea Energy Solutions (UK) Ltd. / Company No. 7804453
Trade Mark Rights Subsea Energy Solutions (UK) Ltd. / Company No. 7804453
Patent Rights Subsea Energy Solutions (UK) Ltd. / Company No. 7804453
Features
  • Light weight & hand held
  • Rapid installation, activation & removal
  • Pateneted field proven design